Imagine Project update through 5/27/19:


· Total Dollars Pledged plus non-pledged:  $1,277,481.83, up $47.00
· Currently collected cash and checks:  $291,415.33, up $7,744
· BPM Construction loan debt:  $76,122

Fire suppression system installation continues in the attic and on the second floor. Electrical and HVAC systems installation is ongoing, and re-routing of pipes and electrical to prepare for the elevator installation is nearly complete. Pit for elevator is dug and ready for concrete. 

Check out the details under the Imagine Project tab on Crossroads’ website.