Imagine Project update through 6/24/19:


· Total Dollars Pledged plus non-pledged:  $1,278,257.83, down $39.00
· Currently collected cash and checks:  $310,325.08, up $4,196
· BPM Construction loan debt:  $0.00
· IMAGINE Construction loan debt:  $305,119.24

Fire suppression system installation in nearly complete.  HVAC systems installation continues and rooftop units are installed.
LULA elevator pit is poured and re-routing of pipes and electrical to prepare for the elevator installation is nearly complete.

Check out the details under the Imagine Project tab on Crossroads’ website.