Crossroads meets at the Adrian High School Performing Arts Center. Sunday's 9:30 a.m. & 11:00 a.m.


Imagine Project update through 7/22/19:


· Total Dollars Pledged plus non-pledged:  $1,278,639.83, unchanged
· Currently collected cash and checks:  $336,967.83, up $13,222.75
· BPM Construction loan debt:  $0.00
· IMAGINE Construction loan debt:  $657,330.21

Fire suppression system installation in nearly complete. HVAC systems installation continues and rooftop units are installed. LULA elevator pit is poured, re-routing of pipes and electrical to prepare for the elevator installation is complete and walls for the elevator are being built. Stud walls in the Nursery and K-4 spaces are complete as well. 

Check out the details under the Imagine Project tab on Crossroads’ website.
Feel free to contact me at the church office (266-1919) with any questions.

Leave a Comment

*