Imagine Project update through 7/8/19:


· Total Dollars Pledged plus non-pledged:  $1,280,139.83, up $1,852.00
· Currently collected cash and checks:  $318,895.08, up $4,539
· BPM Construction loan debt:  $0.00
· IMAGINE Construction loan debt:  $305,119.24

Fire suppression system installation in nearly complete.  HVAC systems installation continues and rooftop units are installed. LULA elevator pit is poured, re-routing of pipes and electrical to prepare for the elevator installation is complete and walls for the elevator are being built.  Stud walls in the Nursery and K-4 spaces are complete as well. 

Check out the details under the Imagine Project tab on Crossroads’ website.
Feel free to contact me at the church office (266-1919) with any questions.